In A First In India, Seismometers For ‘Early Earthquake Detection System’ In Bullet Train Project
Out of the 28 seismometers, 22 will be installed along the alignment. Eight will be in Maharashtra—Mumbai, Thane, Virar, and Boisar—and fourteen will be in Gujarat—Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Mahembadad, and AhmedabadOut of the 28 seismometers, 22 will be installed along the alignment. Eight will be in Maharashtra—Mumbai, Thane, Virar, and Boisar—and fourteen will be in Gujarat—Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Mahembadad, and Ahmedabad